Upload these forms with your building permit application:
- Permit Application Form (PDF)
- Schedule 1 Designer Form (PDF) – unless exempt
- Commitment to general review form – unless exempt
This website uses cookies to improve how it works and to make your experience more personal. By using this website, you are agreeing to the cookie rules in our Privacy Policy.
Follow these steps to plan your solar panel installation, apply for a permit and book inspections.
This page is for solar panels installed on a building.
Tip: print this page and use it as a checklist.
On this page:
You need a building permit for solar panel installations when they:
You do not need a permit for ground-mounted systems that are not connected to water or heating sources.
Before applying, make sure all necessary zoning and planning approvals are complete.
Large building projects may require:
Visit the planning and development page for approval requirements.
The Planning team must approve your project before you apply for a building permit.
The qualifications depend on the type of building and roof structure.
Conventional framed roof - a BCIN-qualified structural designer or a professional engineer can design the system. A professional engineer must also perform a field review.
Roof with engineered trusses – a professional engineer must design the system and perform a field review.
Large building – a professional engineer must design the system and perform a field review.
All drawings must be to scale and dated.
For detached, semi-detached, and townhouse homes up to 2 units, include:
For all other building types, include:
Complete the forms that apply to your project.
Contact us if you’re not sure which forms you need.
Forms you need if you’re applying online
Upload these forms with your building permit application:
Forms you need if you’re applying in person
Bring these completed forms to the service counter on the 2nd floor of City Hall:
Permit fees depend on your project. HST does not apply.
The minimum permit fee of $132 is due when you apply. We will bill you for any remaining permit fees during the preliminary review.
Payment options:
Submit your application through the building permit portal.
Upload your drawings and forms when you apply.
Within 2 business days, we will complete a preliminary review of your application. We will check that it is complete, bill you for any remaining permit fees and ask for more information if needed.
Once your application is complete and all fees are paid, the permit review will start.
The typical time to review solar panels is 10 business days.
If we need more information during the permit review, we’ll email you a Status Letter that identifies deficiencies. Receiving a Status Letter is common.
Follow the steps in the Resubmission Guide to prepare and upload revised documents to your existing application and avoid further delays.
Once approved, your permit package will be available on the portal.
We’ll email you instructions on how to access it.
Print the full package and keep it visible at the work site.
Under the Ontario Building Code Act, you must book inspections before the work is covered.
Find the required inspections listed on your building permit under "Mandatory Inspections".
Book inspections through the building portal (find it on the left menu):